三年在线观看免费完整版电视剧_三年成全免费高清大全_三年大片在线观看免费播放国语_三年中文免费视频大全_三年中文在线观看免费播放电视剧_三年片中国在线观看免费大全_三年成全免费高清看西瓜_三年成全免费观看全集完整版_三年中文版在线观看电视剧大全免费_三年片免费观看影视大全打电话_三年成全免费高清观看_三年片在线观看免费观看大全小说

Welcome,Flow Switches,Shanghai ZanKe Automation Technology Co., Ltd Hotline:18001874240
Language: Chinese∷  English

Home> English Website common problem

Turbine flowmeter installation precautions

Time: 2020-02-20 12:02:50 Click:0
Turbine flowmeter installation precautions is following:

(1) Installation site
The turbine flowmeter sensor should be installed in a place where maintenance is easy, and the pipeline is free from vibration, strong magnetic interference and heat radiation. When installed outdoors, there should be measures to avoid direct sunlight and rain.
(2) Installation requirements and precautions
The sensor installed horizontally of the turbine flowmeter requires that the pipeline should have no observable tilt (within 5 deg;). The vertical deviation of the sensor installed vertically should be less than 5 deg;, and the fluid direction should be downward and upward.
Where the flow cannot be stopped, bypass and stop valves should be installed.
If the fluid contains impurities, a filter should be installed on the upstream side; if it contains gas, a deaerator should be installed on the upstream side. The drain and air outlet of the filter and the air cleaner should lead to a safe place.
The flow regulating valve should be installed downstream of the sensor, and the upstream shut-off valve should be fully opened during measurement, and must not cause vibration and external leakage. For processes that may produce reverse flow, check valves should be added to prevent reverse flow of fluid.
The sensor should be concentric with the pipeline, and the sealing gasket must not protrude into the pipeline. The sensor should no longer be at the high point of the pipeline, so as to prevent the gas accumulated in the pipeline (such as air mixed in when the flow is stopped) staying at the sensor, which is difficult to discharge and affect the measurement.
The pipes at the front and rear of the sensor should be supported firmly without vibration. For condensable fluids, heat insulation measures should be taken for the sensor and its front and rear pipes.
Transmission cables are usually two-core or three-core with shielded signal cables. The shielded signal cables should be grounded at the end of the display instrument (flow totalizer or flow calculation controller). The transmission path should not be parallel to the power supply line. Area where lines are concentrated.
Turbine flowmeter installation precautions
Article from:yibiaohui

TheTurbine flowmeter is one of the main products of the NOIKE. For more information, please visit the product page orZANKE staff.